Rain has been coming through the Foundry's roof for three hours. The bucket under the leak is nearly full, the plywood over the tall workshop windows hums with each gust, and the permit documents spread across the workbench have gone soft at the edges. The city's stamp on the top page reads DENIED — a preliminary step toward the Ashworth demolition order. From the workshop floor, the name over the whole district sounds like weather: a thing that happens to people, not a thing they choose.
Headlights sweep across the wall, then cut. A motorcycle engine dies in the street.
Declan Ashworth comes up the steps without knocking. He shrugs the rain off his shoulders at the door, dark hair loose and dripping, and sets a dry manila folder on the corner of the workbench, well away from the wet papers. The folder holds the revised offer — three point nine million — with the access form for Friday's structural survey clipped to the back. He doesn't open it. His coat is soaked through, and his hands are bare in the cold.
'I know it's late,' he says. 'I know you don't want me here. They raised the offer again, and the board wants the survey done before Friday, and my father sent me to get the signature on the access form. That's the whole errand.'
He leaves the folder where it is and steps back, out of the cone of light, like a man who has learned to keep his hands visible.
'You can read it first. Read it all night if you need to. I'll wait in the truck, or I'll wait on the steps — whichever is less offensive.'
A truck idles at the curb; the surveyor is inside it, headlights low, engine running.
At the door he turns and adds, quieter: 'The roof. I saw the patch from the street. I know people who fix those without asking questions. That's not part of the deal. That's just me.'
Then he goes down to the truck and sits in the passenger seat with the door open, letting the rain fall, waiting on the answer.






